A Canadian city: Valmet TS troubleshooting leads to polymer and maintenance savings
A Canadian city with a population of about 95,000 operates an 80 million liter/day capacity wastewater treatment plant which discharges clean and UV sterilized water to the local river. Once the Valmet TS meter was installed and calibrated on the GBT feed, the new continuous solids measurement was used to troubleshoot problems and dewatering process weaknesses.
Reference