Search results

In References

Filters

Warping and runnability problems cured in Cartonajes Santorromán

Warping and runnability problems cured in Cartonajes Santorromán

When faced with a warping problem, Santorromán turned to Valmet for a solution.

Reference
Successfull PeriVapor installation in Hansol, Korea

Successfull PeriVapor installation in Hansol, Korea

Hansol HomeDeco installed the Valmet Steam Separator PV (PeriVapor) directly after the refiner on the mill’s line for core fiber production.

Reference
Successful start-up of a grade conversion rebuild at Bear Island in Ashland, Virginia

Successful start-up of a grade conversion rebuild at Bear Island in Ashland, Virginia

Cascades announced that it produced its first roll of 100% recycled containerboard at the Bear Island mill in Virginia, United States.

Reference
Joint evaluation reviews with Valmet create increased value and improved performance

Joint evaluation reviews with Valmet create increased value and improved performance

Mälarenergi plant in Västerås, Sweden, makes their own process evaluation which are being reviewed together with our experts – a valued cooperation.

Reference
Achieving success through continuous improvements and close relationships

Achieving success through continuous improvements and close relationships

Collaboration since commissioning of the CFB boiler, we have run service agreements successfully with continuous improvements. Local service team have close relationship with RWE Markinch.

Reference
Highly responsive support provides confidence and continuous improvements

Highly responsive support provides confidence and continuous improvements

A long-term collaboration that keeps society running, for over a decade we have supported Övik Energi in driving plant development forward

Reference
Exceptional board quality achieved on a high-speed board machine featuring automated retention control

Exceptional board quality achieved on a high-speed board machine featuring automated retention control

Valmet RM3 is helping Kipaş Kağıt PM1 measure and control their headbox and white water consistency. The analyzer is reliable and maintains the stability in the wet end of their fast-running board machine. With Valmet RM3, the mill maintains competitiveness through continuous real-time monitoring of retention.

Reference
SCA Ortviken pulp mill - CTMP project

SCA Ortviken pulp mill - CTMP project

The demand for newsprint and magazine paper in the world has decreased and in order to adapt to this change, SCA decided to shut down the production of newsprint and LWC at the Ortviken mill in Sweden and focus on producing CTMP pulp instead.

Reference
Woodland Pulp & Valmet: Boosted Productivity & Dewatering Capacity

Woodland Pulp & Valmet: Boosted Productivity & Dewatering Capacity

Discover how the collaboration between Woodland Pulp and Valmet experts led to enhanced productivity and expanded dewatering capacity at their mill. Learn more about this successful partnership and its positive impact on mill operations.

Reference
Annual planning cuts downtime at Canadian pulp mill

Annual planning cuts downtime at Canadian pulp mill

Reduce downtime with customized annual outage planning. Learn how a pulp mill partnered with Valmet for OEM expertise, spare parts planning, and on-site outage support.

Reference